All operations related to the termination of Site-96 have been concluded. The subsequent report outlines the outcome of the procedure. Agents were removed from the site concurrent with the activation of the shutdown sequence. A thorough evaluation of the site revealed minimal collateral impact. Continued monitoring is required to assess the long